Minutes, IBIS Quality Committee 20 Jan 2009 11-12 AM EST (8-9 AM PST) ROLL CALL Adam Tambone * Anders Ekholm, Ericsson Barry Katz, SiSoft Benny Lazer Benjamin P Silva Bob Cox, Micron Bob Ross, Teraspeed Consulting Group Brian Arsenault * David Banas, Xilinx * Eckhard Lenski, Nokia Siemens Networks Eric Brock Guan Tao, Huawei Technologies Gregory R Edlund Hazem Hegazy Huang Chunxing, Huawei Technologies John Figueroa John Angulo, Mentor Graphics Katja Koller, Nokia Siemens Networks Kevin Fisher Kim Helliwell, LSI Logic * Lance Wang, IOMethodology Lynne Green * Mike LaBonte, Cisco Systems Mike Mayer, SiSoft * Moshiul Haque, Micron Technology * Pavani Jella, TI Peter LaFlamme Randy Wolff, Micron Technology Radovan Vuletic, Qimonda Robert Haller, Enterasys Roy Leventhal, Leventhal Design & Communications Sherif Hammad, Mentor Graphics Todd Westerhoff, SiSoft Tom Dagostino, Teraspeed Consulting Group Kazuyoshi Shoji, Hitachi Sadahiro Nonoyama Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Mike LaBonte conducted the meeting. Call for patent disclosure: - No one declared a patent. AR Review: - Mike look into MeetingPlace issues - Some problems had been experienced inside Cisco - WebEx should become available at some point - Mike propose IBISCHK bug for 5.5.6 - TBD New items: - Lance had sent email about checks for PullUp/Pulldown going through zero. - The checked for PullUp currents said PullDown in the text. - We corrected 5.3.11 to say Pullup - Pavani: Doesn't this apply only to full swing technologies like CMOS? - We fixed 5.3.10 & 11, adding "for full swing technologies such as CMOS". 5.4.2. {LEVEL 2} V-T table endpoints match fixture voltages - Moved here from 6.2 - Moshiul: Pavani: We could split 5.4.1 into separate checks Next meeting: 27 Jan 2009 11-12 AM EST (8-9 AM PST) Meeting ended at 12:04 PM Eastern Time.